Intel Details

South Africa: Merafe's Lion smelter resumes ferro chrome production following power tariff relief

Ferro Chrome
19 Feb 2026, 12:20 IST
Steel Mint Intel

Merafe's Lion Smelter restarted ferro chrome production at 50% capacity on 16 Feb'26 following a shutdown of around 9 months. This was driven by the National Energy Regulator of South Africa approving a temporary reduction in electricity tariffs for a 12-month interim period. The Glencore-Merafe joint venture expects the smelter to return to its full operational capacity by 31 Mar'26.

19 Feb 2026, 12:20 IST
You have 2 complimentary intel remaining! Stay informed with BigMint
;